Design & installation Guide For McQuay MDS Multi System
Insulation and protection of the pipeline
All pipelines must be insulated.
Take good protection measures for the pipelines to avoid collision, trample, and scratch and
abrasion when the pipeline vibrates. Otherwise, the pipeline may be damaged, affecting the
unit performance and security, or even causing other safety problems.
Note: After the pipelines are installed, evacuate and pump vacuum.
Connection of the system balance pipe
Make sure the system balance pipe is connected. The system balance pipe should be
connected to the unit through the continuous side hole in the chassis or that in the side panel
or that in the unit piping position.
The balance pipe must be connected orderly, and the connection higher than the level of the
pipe to stop valve of the balance pipe.
Take good protection measures for the balance pipe (especially the place between the
continuous side ports) to avoid scratch and abrasion.
The connection between the balance pipe and the unit is shown in the figure below.